Featured Projects
New Stanford HospitalLocation: Stanford University, Palo Alto, California Owner: Stanford Hospital and Clinics General Contractor: Clark/McCarthy, a Joint Venture Architect: Rafael Vinoly Architects Project Features: Design Assist, Preconstruction, OSHPD, Collocation Project Description: New 800,000 sf Hospital for the Stanford Unviersity Hospital & Clinics including 368 beds and 28 interventional procedure rooms. |
45 LansingLocation: San Francisco, CA Owner: Crescent Heights General Contractor: Build Group Architect: HKS Project Features: Design Build, LEED, CUP, High Rise Project Description: Design Build HVAC systems for a 471,000 sf, 39-story high rise residential building. Attempting LEED NC Silver Certification. |
Brocade Offices @FirstLocation: San Jose, CA Owner: Brocade General Contractor: Vance Brown Builders – Devcon Construction Architect: RMW - Korth Sunseri Hagey Project Features: Build, LEED, CUP, Underfloor, Data Center, Laboratory Project Description: Design Build Underfloor HVAC systems and Tenant Improvement for (3) new High Tech office building for Brocade’s new headquarters campus totaling 575,000 sf. The complex includes 80,000 sf of high-density labs and data centers, 20,000 sf specialty lab areas including hardware and environmental labs, 385,000 sf office space, 15,000 sf cafeteria and kitchen as well as conference rooms, auditorium, gym and theatre. Achieved LEED CS 2.2 Silver and CI 2.2 Gold Certification. |
Hewlett Packard at Moffett TowersLocation: Sunnyvale, CA Owner: Hewlett Packard General Contractor: Rudolph & Sletten Architect: Gensler Project Features: LEED, CUP, Data Center, Fast Track Project Description: Fast Track Plan/Spec HVAC Tenant Improvement for the 365,000 sf High Tech office space including a Data Center and Central Plant. Achieved LEED CI Gold Certification. |
|
AFRHArmed Forces Retirement Home "Scott Project" Location: Washington, D.C. Owner: GSA General Contractor: Hensel Phelps Construction Co. Architect: Cooper Carry Project Features: Design Build, LEED Project Description: Design Build HVAC for a 160,000 sf Retirement Home facility for military veterans including full service dining facilities, theater, gym, clinic and dental facilities etc. Attempting LEED NC Gold Certification. |
||||
Sentara Lake RidgeLocation: Lake Ridge, Virginia Owner: Hammes Company Architect: RSg Architects General Contractor: DPR Construction Status: Complete Project Features: Award Winning: "Excellence in Construction" from Associated Builders & Contractors Metro DC Area; Design Build Project Description: This project is a Design Build 40,000 sf, 2-story Emergency Department and Imaging diagnostic center. |
AFTACArmed Forces Technical Applications Center (AFTAC)
Location: Patrick Air Force Base, FL Owner: US Army Corps of Engineers, Mobile District General Contractor: Hensel Phelps Construction Co Architect: HOK Project Features: Design Build, CUP, Underfloor, Data Center, Fast Track, Clean Room, Laboratory, LEED Project Description: Fast Track Design Build Underfloor HVAC systems for a 325,000 sf HQ and Lab campus for the US Army Corps of Engineers including Radiochemistry Labs, Clean rooms, Headquarters, Auditorium, and a Chiller Plant. Attempting LEED NC Silver Certification. |
Millennium TowerLocation: San Francisco, CA Owner: Millennium Partners Architect: Handel Architects General Contractor: Webcor Builders Status: Complete Project Features: Parking, Design Assist, High Rise Project Description: Two high rise towers of 58 and 11 stories of high end residential condominiums with 5 levels of underground parking. |
Bishop Ranch Business ParkLocation: San Ramon, CA Owner: Sunset Development General Contractor: Sunset Development Architect: Hoover & Associates Project Features: Design Build Project Description: Design Build HVAC systems for 25 office buildings totaling over 3,000,000 sf. We began work at Bishop Ranch over 30 years ago and maintain a relationship with them to this day through Design Build Tenant Improvements. |
Planet Hollywood TowerLocation: Las Vegas, NV Owner: Westgate Architect: GBK/Morris Architects General Contractor: Tudor Saliba Status: Complete Project Features: Design Assist Project Description: Planet Hollywood Tower by Westgate is a 52-story mixed use building totaling 1.8 million square feet including residential, retail & convention space. |
Santana RowLocation: San Jose, CA Owner: Federal Realty Investement Trust Architect: Sandy Babcock General Contractor: Bovis Lend Lease Status: Complete Project Features: Central Plant Project Description: Santana Row is a 42-acre residential and retail mosaic that encompasses 514 town homes, lofts and villas, 70 retail shops, 20 full service restaurants, 9 spas and salons, a movie theater and the boutique Hotel Valencia. This project included a central mechanical plant that serves the entire block. |
Clement Hotel MontereyLocation: Cannery Row, Monterey, CA Owner: Pacific Hotel Management General Contractor: Devcon Construction Architect: Devcon Construction Project Features: Design Build Project Description: Design Build HVAC system for a 203,000 sf Intercontinental hotel built on the historic Cannery Row waterfront. The new hotel consists of two buildings including 200+ guestrooms, a parking garage, restaurant and retail space. |
The InfinityLocation: San Francisco, CA Owner: Tishman Speyer Architect: Arquitectronica Heller Manus General Contractor: Webcor Builders Status: Complete Project Features: High Rise, Design Build Project Description: A San Francisco city block of Luxury Condominiums overlooking the Bay Bridge consisting of two high rise towers and two out buildings. |
||
Norman Y. Mineta San Jose International AirportLocation: San Jose, CA Owner: City of San Jose Architect: Fentress Architects General Contractor: Hensel Phelps Construction Co Status: Complete Project Features: Central Plant; LEED Certified NC Silver, Design Build Project Description: The San Jose International Airport Improvement Project is approximately 300,000 sf of new and remodeled construction including new terminals, remodeled terminals, a baggage handling system and central plant expansion. The work is being done in several phases to maintain operation while improving the existing terminals A & C and simultaneously constructing a new terminal located between them. The new Terminal B will replace Terminal C, will connect to the upgraded Terminal A and includes new inline baggage screening systems for greater efficiency. CMI is providing design and construction services throughout the project. |